Upton Power Failure
Minor incident
POPs
Upton
2024-09-03 19:59 BST
· 1 day, 2 hours, 55 minutes
Updates
Resolved
September 4, 2024 · 22:54 BST
This has been resolved and some preventative maintenance will be required in the future.
De-escalate
September 3, 2024 · 20:40 BST
Engineers have flipped the faulty breaker and power has been restored. Awaiting RCA for issue and long term resolution
Issue
September 3, 2024 · 19:59 BST
Mains power to Upton has failed again - Batteries have run through their 30 minute duration and the generator has not fired.
Site is hard down until the power is restored or generators are started.
We have personell on route to the location to identify the issue and report back. Next update due at 20:30