London Core - THN - Maintenance from 2023-08-08 05:00 BST to 2023-08-08 07:00 BST
Scheduled maintenance
Network Core
Nationwide Ethernet
Nationwide FTTx
Basingstoke
Farnborough
Langley
Rothwell
2023-08-08 05:00 BST
· 2 hours
Updates
Update
August 8, 2023 · 07:05 BST
This maintenance work has been completed without issue.
There was a minor 2 minute blip in connectivity for some customers whilst BGP reconverged however this was expected and managed appropriately.
There are no further outages expected as a result of this work being completed.
Scheduled
August 7, 2023 · 13:54 BST
Implementation of additional routing peerings within London core infrastructure.
This change is required to further increase the redundancy between 1310’s core infrastructure and the wider internet, providing increased connectivity capabilities and redundancy options.
← Back